Key facts
Verified records by installed system
WS300-66
- Installed
- June 2026
- Protected scope
- 4 large texturing machines
- Backend sag records
- 13
- Successful ride-through records
- 13
WS300-67
- Installed
- July 2026
- Protected scope
- Another 4 large texturing machines
- Backend sag records
- 5
- Successful ride-through records
- 5
Record cutoff: August 24, 2026
Challenge
Brief grid events could stop coordinated textile production.
Texturing machines depend on coordinated drives and auxiliaries. A short voltage sag could therefore create a production stop and a much longer recovery sequence.
Protection scope
Protection was expanded in two verified stages.
Wilson Technology applied separate WS300 systems to two groups of critical texturing equipment while preserving system-specific monitoring records.
Result
Every released backend record shows successful ride-through.
The published result is limited to each system’s own backend dataset through the stated cutoff date.
Evidence and data integrity
The two datasets remain separate.
The two systems report backend records separately. The same grid disturbance may have been recorded by both systems, so 13 plus 5 must not be described as 18 independent plant-level voltage-sag events.
This page does not publish or imply power rating, sag depth, sag duration, ROI, customer company name, detailed electrical topology, efficiency, or certification status.